Commit Graph

2 Commits

Author SHA1 Message Date
didericis 47c3ba63f8 docs(prd): mark merged PRDs as Active
test / unit (pull_request) Successful in 36s
test / integration (pull_request) Successful in 58s
test / integration (push) Successful in 54s
test / unit (push) Successful in 32s
Flip Status: Draft -> Active for the 23 PRDs whose work has shipped to
main (including 0027, now that PR #95 has merged). Leaves the
terminal-status PRDs unchanged: 0007 and 0010 (Superseded) and 0014
(Retargeted) were replaced, not shipped as-is.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-28 22:12:03 -04:00
didericis de87f21ff8 docs(prd-0016): capability block remediation
test / unit (pull_request) Successful in 17s
test / integration (pull_request) Successful in 1m13s
Adds PRD 0016, the heaviest of the three remediation engines in the
stuck-agent recovery flow (overview in PRD 0012, foundation in PRD
0013). Wires the capability block path: rebuild orchestrator,
state-preservation helper, capability-block end-to-end. On approval
the orchestrator tears down the bottle, builds from the new
Dockerfile, and starts a replacement on the same branch via
state-preservation.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-25 05:15:32 -04:00