Commit Graph

2 Commits

Author SHA1 Message Date
didericis 47c3ba63f8 docs(prd): mark merged PRDs as Active
test / unit (pull_request) Successful in 36s
test / integration (pull_request) Successful in 58s
test / integration (push) Successful in 54s
test / unit (push) Successful in 32s
Flip Status: Draft -> Active for the 23 PRDs whose work has shipped to
main (including 0027, now that PR #95 has merged). Leaves the
terminal-status PRDs unchanged: 0007 and 0010 (Superseded) and 0014
(Retargeted) were replaced, not shipped as-is.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-28 22:12:03 -04:00
didericis 0197599e49 docs(prd-0015): pipelock block remediation
test / unit (pull_request) Successful in 17s
test / integration (pull_request) Successful in 1m12s
Adds PRD 0015, the second remediation engine in the stuck-agent
recovery flow (overview in PRD 0012, foundation in PRD 0013). Wires
the pipelock block path with restart-based reload: supervisor writes
the new allowlist on approval and restarts pipelock, proactive
pipelock edit TUI verb, pipelock audit log filled in. SIGHUP reload
for pipelock is deferred to a follow-up.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-25 04:54:25 -04:00